Nothing Substandard Leaves the Essco Shop. That’s our Promise.

Engineered offsite heating, hot water and electrical prefabricated solutions to suit your requirements and budget.

Our engineers understand the pressures faced when working on site and have successfully project managed many builds to tight schedules. You can rely on us to help you do a good job for your customer.

Prefab plant room design

DESIGN

Our skilled engineers design packaged plant or prefabricated cupboards to your project specification.
Prefab build

BUILD

Products are built from scratch in our dedicated warehouse space to a high standard.
Essco Group Adanac Offices

DELIVER

Located in Southampton, Hampshire, we have excellent access to the motorway network. Our project team will work with you to meet your installation schedule.
Packaged boiler house

Features & Benefits

  • Offsite prefabrication saves time and reduces project costs
  • Expensive equipment stays off site making it less vulnerable to theft
  • Simplified logistics and project management
  • Technical support on-hand by phone, video call, email or face to face
  • Gas Safe Registered engineers with extensive experience
  • Cloud-based; project specific QA files available via QR code
  • Products are tested and approved for peace of mind
  • Aftersales service and support – ESSCO never walk away
  • 2-year warranty as standard

 

gas-safe-logo

Prefab Cupboards with heat recovery

Prefab Utility Cupboards for Heat Networks

With communal heating in apartments on the rise, many developers are choosing to install prefabricated utility cupboards to reduce cost and risk. This also allows them to deliver projects ahead of schedule.

Our utility cupboards are supplied fully fitted, pre-tested and ready to install on-site.

Typically, they include –

Essco cupboards are built bespoke to project design requirements.

Heat Interface Unit and Mike Bennett

EDGE Heat Interface Units (HIUs)

Our HIUs are perfect for use in prefabricated utility cupboards for heat networks.

Units feature first-class components, including the market-leading valve from ESBE and intelligent electronic flow and temperature control technology.

 

Southampton Hospital Plant Room

Packaged Plant Rooms and Skids

Reduce onsite labour costs and simplify installation with our bespoke packaged plant.

Equipment ranges from skid mounted buffer tanks or simple heat transfer packages to complete plant rooms with BMS control.

From initial design and specification to finished product on site, we can provide a solution no matter how big or small.

Plant Room JUL 2023

Prefabricated offsite solutions can mitigate issues such as –

  • labour and skills shortages
  • Theft on site
  • Soaring material and labour costs
  • Poor onsite workmanship
  • Difficult site conditions and access problems
Mobtag QR Code

Digital QA Process

We partner with Mobtag to digitise the QA process.

This cuts down on paperwork and gives our customers easy access to QA files and O&M manuals specific to each plant room or PUC from any internet connected device.

Especially useful during commissioning and handover.

Scan the QR code opposite to access a sample project QA pack.

Latest News & Case Studies

Prefab plant room delivery Time Lapse

A Speedy Plant Room Delivery!

Company NewsPrefab News

It was great to watch as this packaged plant room was carefully loaded onto the lorry ready for delivery to our customer. We provided a full design and build package on this 900kW packaged plant room for a highly valued repeat customer. It was a pleasure working alongside BJF Group to deliver this prefabricated solution…

Soton Hospital Plant Room

Chilled Water Packaged Plant Room for Southampton Hospital

This chilled water treatment packaged plant room was recently designed and built by us for Southampton Princess Anne Hospital neonatal unit. The plant room includes the following equipment, which was free issued to us for installation – The finished plant room measures 4.5m wide x 3.5m depth by 3.2m height.     Essco were delighted to…

Essco Group Adanac Drive

A move from Cwmbran to Southampton for Essco Prefab

Company NewsPrefab News

We are pleased to announce that our Prefab business is moving from Cwmbran to Southampton this month to join the rest of the company. Through this move, we will be able to accommodate the growing needs of our prefab division within Essco Group’s new facilities. Our facilities are located on a business park three miles…

Prefab Utility Cupboards

Prefab Utility Cupboards with EAHPs

Company NewsPrefab News

We recently built these prefab utility cupboards for 55 residential apartments in Chiswick that will benefit from an energy efficient heat recovery system. Cupboards feature an unvented hot water cylinder (150/180L) with a Joule Modul-AIR ALL-E Exhaust Air Heat Pump (EAHP). The innovative EAHP technology uses waste heat from the extract ventilation through a heat…